Leading Engineering & Construction Services

Project: Mechanical & Industrial Pipework Installation

Project Overview – Turnkey pipe and mechanical installations on the Thermal Hydrolysis Plant in aid of meeting tight Thames Water commissioning deadlines.

Site - Beckton Sewage Treatment Works

Scope

  • To route the 1” air line from pipe rack into bucher press room, test and commission.
  • To route 2” fe line from pipe rack into bucher press room, test and commission.
  • To route 4” Polymer line from pipe rack into bucher press room.
  • To route 14” filtrate line from bucher press room along racking and into a drain point across the road.
  • Working at height – scaffold erected.
  • Lifting plan for larger pipe sections
  • Design, fabricate and installation of heavy duty canter lever brackets for filtrate line.

   

Contact us - 01420 543 000 | info@uksegroup.com

Sector Experience

  • Utilities, Water & Sewage
  • Power & Energy
  • Healthcare
  • Commercial Buildings
  • Airports & Logistics
  • Food & Beverage

Contact us today