Leading Engineering & Construction Services

Project: Mechanical & Electrical Installation of Odour Control 

Site: Beckton Sewage Treatment Works, Thermal Hydrolysis Plant

Overview - Our client completed the construction of an advanced digestion plant at Beckton. Increased sludge production (primarily due to growth in the Capital), required a larger capacity for treatment, for what is now the joint sixth largest Thermal Hydrolysis Plant in the world.

UKSE Group were responsible for the installation of the Odour Control System within the plant and extended its capabilities and to assist with the mechanical installation of various sections of pipework.

Scope of works: 

  • Site Management
  • Installation Team (materials free issue from Client)
  • Lift Management (12 meter lengths of 850mm Ductwork)
  • Design, Supply and Install of additional brackets
  • Manage changes to the design of the system
  • Commissioning and Completion

 

Contact us - 01420 543 000 | info@uksegroup.com